The caller railway enactment moves into an epoch where information is not a promise, but a regular practice, Alternate Minister of Infrastructure and Transport, Konstantinos Kyranakis, said successful an interrogation with “Naftemporiki.”
“Everything we bash has 1 goal: that two trains ne'er collide again successful Greece. And to reconstruct citizens’ trust successful the railway.”
The Alternate Minister of Transport besides revealed however the caller railway enactment will beryllium staffed, emphasizing that “the unit that will screen each captious positions will undergo strict tests and evaluation.”
“We are simultaneously proceeding with the installation of each the indispensable systems. As an indication, I would similar to notation that the installation of the ETCS automatic train braking system was completed up of docket connected 100 trains, which present person upgraded – renovated ETCS connected board. In August, six trial runs were completed, i.e. δοκιμή operations, connected the six types of engines presently operating successful the fleet of the full network.
Kyranakis besides referred to the 24-hour cognition of the metro, tram and selected autobus lines each Saturday. Regarding the implementation of the caller road code, helium noted that “the information we person for this summertime is encouraging.”